skip to main | skip to sidebar

Wednesday, April 23, 2008

Construction Site visit two



- underside of composite construction slab

-props (braced) holding up ceiling joists and composite slab

site: New TAC building, Geelong CBD

Posted by Kate Van Der Kruik at 9:43 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Kate- Construction and structures 2

Blog Archive

  • ▼  2008 (22)
    • ►  November (1)
    • ►  June (2)
    • ►  May (3)
    • ▼  April (11)
      • Article six
      • Article four
      • Article five
      • Construction Site visit two:
      • Construction Site visit one:
      • Construction Site visit one:
      • Construction Site visit one:
      • Construction Site visit two
      • Section through a Composite Construction wall
      • Section through a pre-cast concrete panel wall
      • Section through a pre-cast concrete panel wall
    • ►  March (5)

About Me

Kate Van Der Kruik
View my complete profile